The Refractory Expert

All Things Refractory

  • Home
  • FAQ
  • Contact The Expert!

Risk Management

June 19, 2015

A successful project has incorporated plans that look ahead for the unexpected and assesses the possible impacts that future risks can have on the overall project. Part of the process is ensure that the identification all of the adverse events that can happen have a plan in place to alleviate negative impacts to operations, schedule and installations.

It is essential to with customers to identify events that could happen throughout the life of the project that would adversely impact to the schedule, cost or quality, and to work with your customer to prioritize the risks related to the project or maintenance of the equipment.

For each project, calculate risk exposure based on impact, probability and ability to control risk and establish a plan related to risk avoidance and mitigation strategies into place.

Filed Under: Risk Management

Categories

  • Expert Witness
  • Inspection Test Plans
  • Installation Methods
  • Long Term Maintenance
  • Material Specification
  • Reliability
  • Risk Management
  • Specifications
  • Work Procedures
Hands-on expertise in designing, installation, upgrading and servicing refractory linings in power since 1953.

Copyright © 2025 · The Refractory Expert